What the installation includes
Cable, fusing, earthing, and a test under load. Inverter size is set at the quote from the appliances you want to run.
Caravan installs
Complete 12V off-grid system upgrades for touring caravans — lithium batteries, solar, BMS, inverter and full integration. Workshop installs in Newcastle for Hunter Valley travellers.
Touring caravans need reliable off-grid power for fridges, lighting, charging and 240V appliances. Offroad Electrics designs and installs complete 12V systems for caravans — not add-on accessories or general auto electrics, but full upgrades built for extended off-grid travel.

The inverter is fitted as part of the off-grid caravan power system. We size a pure sine wave inverter for the 240V appliances you run, then wire, fuse and test it at the Mayfield West workshop.
Cable, fusing, earthing, and a test under load. Inverter size is set at the quote from the appliances you want to run.
The inverter needs a battery that can supply the load. If the van still has lead-acid, or the lithium bank is too small, that upgrade is done in the same job.
Solar and DC-DC charging from the tow vehicle sit in the same off-grid caravan power system, so the inverter has power when the van is parked.
This is a complete upgrade. Leave the caravan at Mayfield West and we hand it back with the inverter, battery and charging tested together.
Every project is a complete off-grid system upgrade — designed, wired and tested at our Newcastle workshop.
Recently bought a used van with an outdated electrical setup? We specialise in complete system upgrades to match how you actually tour.
Leave your caravan at our Mayfield West workshop for the agreed timeframe. We complete the upgrade and hand it back off-grid ready.
We review your tow vehicle charging setup as part of the overall system design — so van and car work together from day one.
Other vehicle types, recent workshop projects, and answers to common questions.
Tell us about your van and touring needs. We review every enquiry and call back if the job is a fit for a full system upgrade.